Beginning Friday, Aug. 22, temporary fencing will be installed along the north side of the North Classroom building (playing field side), in preparation for the Democratic National Convention.
Access may be limited to the south entrances of the building at some point during the day on Friday. Signage will be posted with alternate entrances and exit routes.